The Research Of Hui Tengliang Wind Farm Electrical Engineering Project Construction Organization Management

Posted on:2012-07-16Degree:MasterType:Thesis
Country:ChinaCandidate:F YunFull Text:PDF
GTID:2219330338968619Subject:Project management
Abstract/Summary:PDF Full Text Request
Xilin Gol League has the abundant wind energy resources, wind energy zoning classification show that wind energy are suitable for development of large-scale wind power plants. area the project located has rich in wind resources, this field area mostly are hilly prairie terrain. Construction of XX wind farm, by using local rich wind energy resources, not only can save fuel and water resources, do not cause environmental pollution, but also help improve the energy structure in Inner Mongolia to build wind power base, for driving the rapid economic development of Inner Mongolia play an active role.The paper determined the location and direction of the wind farm by analysis of wind energy resources; then through the technical and economic analysis to determine the selection of wind turbine and the electrical engineering system design. Abort construction of wind farm construction problems, focused on the construction of the project organization and responsibilities, project schedule management, project quality management, quality management, project an important part of the construction organization, and finally proposed the strengthen measures of the construction of wind farm project schedule management, quality management.The paper evaluates the performance evaluation with established index system and applied with fuzzy AHP on construction organization and management of the wind farm. Results demonstrate the effectiveness of the algorithm. It is high reference value for similar projects on the design, construction and evaluation.
Keywords/Search Tags:Wind energy, electric project, design schama, building organization
PDF Full Text Request
Related items