Font Size: a A A

Research On The Post-evaluation Shijiazhuang Shibei Power Transformer Engineering Projects

Posted on:2012-10-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiuFull Text:PDF
GTID:2219330338968992Subject:Project management
Abstract/Summary:PDF Full Text Request
North Shijiazhuang distribution network construction lag, still cannot adapt to the needs of the development of rural economy, the capital and technology of many aspects, such as reasons for many years, some of the power grid structure exists weak links. Along with the rapid economic development of Xingtang, distribution network construction lagging contradictions will become more prominent, accelerate distribution network planning and construction is imminent, imperative. at fransmission XingtangXian distribution network is to improve the construction of the state and investment lagging. After completion of the project, certainly will need to put into use for the project construction and operation evaluation, in order to verify the correctness of the investment decisions, effective and scientific. Through developing grid construction project evaluation, not only can comprehensively objective testing measure grid planning, timely correcting planning work problems in the scientific level to improve planning; And to be able to diagnose grid construction project operation management level, prompting grid enterprises improve power grid construction economic benefits and social benefits and environmental benefits. Therefore, this paper makes a Post-Evaluation of at Power Transformer Engineering Projects.This article from the whole project implementation, evaluation of environmental impact assessment, benefit evaluation based on direct fuzzy sets and the similarity comprehensive evaluation four aspects to evaluate at Power Transformer Engineering Projects. First of all, the whole process from the start of the project implementation process of the project at all stages of the problem and results; and from an environmental point of view of the project on the impact of the environment; the following from a financial point of view of investment in the project brought to the benefits, and finally to consider the overall implementation of the project results.
Keywords/Search Tags:Power transmission project, process post evaluation, environmental post assessment, financial post evaluation, comprehensive post evaluation
PDF Full Text Request
Related items