Font Size: a A A

Study On Dispatching And Operation Management Of Gree Electric Appliances,Inc. Of Zhu Hai

Posted on:2012-01-23Degree:MasterType:Thesis
Country:ChinaCandidate:S LiangFull Text:PDF
GTID:2219330362954237Subject:Project management
Abstract/Summary:PDF Full Text Request
In the contemporary age, China is in the course of big country to strong country of manufacturing , Dispatching and Operation Management of manufacture is more important to manufacture , it decides high or low of productivity ,and good or bad of product quality ,and can or cannot consignment on tiame.In this paper, through the analysis of the dispatching and operation management conditions of screw chiller in Gree Electric Appliances,Inc.Of Zhu Hai ,mainly including assemblage materiel management,plan control management,abnormity management ,we formulated the related measures for improving the dispatching and management level. The assemblage materiel management mainly analysis the provide materiel on schedule,including sel-support materiel and buy materiel , this two tasks will affect the execution of assemblage pian , so we make out the related measures of reducing affect the execution of assemblage pian . The assemblage pian management mainly analysis order insert of rush order ,methods management of order insert of rush order ,can advance on time completion rate greatly .Exception management mainly analysis come into being of exception , take measure follow process , can clear up exception quickly , is important means of ensure normal production and increase production efficiency .
Keywords/Search Tags:Dispatching and operation of assemblage management of screw chiller, Assemblage materiel management, Order insert of rush orde, Exception management
PDF Full Text Request
Related items