Font Size: a A A

Cost Control Scheme For The PC In Oil And Gas Field Surface Construction Project Construction In Chagnqing Company

Posted on:2011-11-14Degree:MasterType:Thesis
Country:ChinaCandidate:J M ZhangFull Text:PDF
GTID:2219330368497553Subject:Project management
Abstract/Summary:PDF Full Text Request
Cost management of oil and gas field surface construction is to enhance the competitiveness of enterprises, the construction of the support YuChangQing throughout the project cost control oil and gas field surface construction project construction project of PC, although changqing oilfield ground engineering construction in recent years perfecting its cost management system, but the cost control scheme also has many insufficiencies, discusses its ground engineering project construction cost control scheme for the PC is of great significance..In this project management knowledge and construction project general contracting of construction projects and standardized management and construction cost management theory, on the basis of the above analysis, combined with JiBai process pipeline project, through actual design, using Delphi method of questionnaire to changqing oilfield ground engineering project cost control PC situation analysis and successful experience, and find out the main problems existing in the construction cost, including inadequate planning and construction process cost control and coordination, completion acceptance process cost control, hidden cost analysis of insufficient system complete. Secondly, in changqing oilfield engineering project construction cost of the PC program not perfect, using process analysis and construction budget act, and puts forward some methods of construction cost budget and cost objectives determine methods, project cost budget adjustment methods, formed the construction cost planning and audit validation procedure, Then, in changqing oilfield engineering project construction process the PC cost control and coordination in the process of construction preparation of cost control and coordinate, coordinate and construction process of cost control, puts forward the improved scheme design and construction process of construction preparation process flow and cost control 5M1E elements formed by construction preparation process, construction process cost control scheme, Then, in changqing oilfield ground engineering project completion acceptance process implied PC can cost control problem, puts forward the completion acceptance rectification process cost control processes and claim control scheme, Finally, in changqing oilfield engineering project cost analysis of the PC insufficient system integrity, on the basis of the project cost management principle, project management knowledge, improve the system guideline project cost analysis and evaluation process, At the same time, combining the actual construction projects in oilfield, the construction cost control scheme, put forward the application research of construction cost control and coordination Suggestions.
Keywords/Search Tags:Oil and gas field surface construction, PC mode, Construction costs Control and coordination
PDF Full Text Request
Related items