Font Size: a A A

Study On Quality Control Of Jilin Oilfield Surface Production Capacity Construction Project

Posted on:2013-05-27Degree:MasterType:Thesis
Country:ChinaCandidate:R L WangFull Text:PDF
GTID:2249330371479832Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Quality problem is the core of the project, the stand or fall of quality related to thesuccess or failure of the engineering projects, related to whether the project can be normal,safely put into production and benefit, so the project quality management is always the firsttopic of engineering project management. Quality refer to the characteristics of the productto meet user, regulations, design documents and the desired extent. These requirements andexpectations are project builders pursuit of the goal, and the quality management is to set upeffective quality management system, by the quality plan, quality control, quality assuranceand quality improvement measures and means to ensure project construction quality toachieve and realize these goals. Because oil and gas field surface construction is largequantities, with a long period, it has more difficulty to doing big quality assessment, whichrequires us construction unit to strengthen the quality management in construction process.Jilin Oilfield Construction Company has been engaged in construction of the productionand oil and gas gathering and transportation on adjacent oil field.2000years later,it beganto develop Jilin Oilfield external market and took part in the Lan-Cheng-chongqing,west-east gas transmission feeder, zhong-wu gas transmission pipeline, western crude oilpipeline, LanZheng chang lines, hebei-ningxia oil pipelines, the second line of west-east gaspipeline, mohe-daqing lines, and a number of long distance pipeline and the construction ofthe station. After years of practice and exploration, Jilin Oilfield Construction Companyformed a set of technology, management mode. After years of exercise, especially after2000,long distance pipeline and the station construction exercise, the quality and technicalstandards of our company construction team has improved significantly.The external market development let we clearly know this more-to develop themarket areas, consolidate in mature market, and expanding the market of hope, to seize theemerging market, it is necessary to strengthen risk consciousness and benefit consciousness,improve market coverage, share and overall competitiveness. Quality management is the top priority.This paper comprehensively and systematically describes the engineering qualityprinciple, methods and measures. This paper expounds the application of qualitymanagement in actual construction,taking the quality management of Daqing-Jinxi crude oilpipeline engineering line (Daqing-xinmiao section) BY Jilin Oilfield ConstructionCompany construction as an example.
Keywords/Search Tags:Oil field ground capacity, construction engineering, quality management
PDF Full Text Request
Related items