Font Size: a A A

Cost Management Research On Construction Of The Fiber To The Building

Posted on:2012-08-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhouFull Text:PDF
GTID:2219330371452492Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The market economy system is gradually established and more perfect,construction enterprise in construction management,is carrying out project management. Quality,schedule,cost management is the three major constraint goal of the whole construction project management,only three of the best combination will to achieve the social benefit and enterprise efficiency unification,can achieve high quality,pace,low cost objectives. This paper,from the construction project cost management perspective,through the specific case of the construction of the project,according to the cost estimation,earned value management analysis of the cost control of research,control the ultimate goal of the project schedule on the basis of cost control. Based on the main existing problems,put forward the corresponding countermeasures.cost management is an important part of the project management,plays a key role,and progress management plays a decisive role to the quality of the construction and the cost. The implementation of the project schedule management and control in order to ensure project completion,and planned period can effectively control the cost,and ensuring the quality of projects. In this article,FTTB access network project for an example,the project management knowledge as the foundation,analyze the implementation of the project ,find out about cost management of the existing problems and analyze the cause of the problem. Put forward countermeasures of the cost plan management and the cost control management. From progress plan,use a bar chart and network diagram project plan and implementation progress dynamic control,through the engineering budget to control the investment of resources and the cost of the project,the implementation schedule to glimmer of progress and economic goals benefit evaluation. Through the bar chart and network diagram for engineering cost plan and implement the dynamic control,through the engineering budget to control the investment of resources and the cost of the project. Finally,evaluation implementation of cost management progress and economic efficiency goal function.
Keywords/Search Tags:Cost Plan, Construction Cost, Cost Control
PDF Full Text Request
Related items