Research On Changzhi Shougang8#Converter Project Scheme

Posted on:2013-05-10Degree:MasterType:Thesis
Country:ChinaCandidate:X M MaFull Text:PDF
GTID:2231330371980054Subject:Project management
Abstract/Summary:PDF Full Text Request
The project mainly study plan, quality, cost and other aspects, these aspects inthe whole project base process are very important, but different items on differentaspects are focused. The8#converter project due to other projects related to theproject, the overall requirements are relatively high. To be on time, ensure the qualityof the completion of the work, to develop a practical scheme is very important. Sothis paper to head the8#oxygen blown converter project as the research direction,focus on the analysis of the project ’s planning and other related problems, throughthe analysis of project goals and time requirements, according to the project itself toformulate detailed program, then, according to the program to determine the specificimplementation of the project work. Finally, according to the project implementationprocess may encounter problems, and put forward the corresponding solution.This paper first introduces the project’s scale of production and product scheme,then according to the project scale and product plan of the overall projectimplementation plan; which focuses on projects related to the main job of theimplementation, which include the construction of site selection, project construction,project two major processes: process converter and continuous casting constructionthe construction process, the project’s overall work were analyzed and theconstruction process are described; finally, the project construction problemsencountered in the process, is the main energy and energy saving, environmentalprotection, labor safety and industrial hygiene problem undertook the key is analysed,analysed the reasons of these problems as well as possible harm, according to variousissues put forward their solutions, and the problems were resolved. In this paper, always pay attention to integrating theory with practice, to head the8#converter project conducted in-depth research, at the same time the project carriedout a detailed analysis, the problems are put forward their solutions. In addition, inthe process of writing this article, also many references and project plan or projectmanagement related literature, from all relevant literature absorbed many of thenutrients in the literature, at the same time some useful methods applied to the studyof this project in the past, in order to better achieve the goal of integrating theory withpractice.In this paper, the theory of project management and project management productof the combination of practice, at the same time in the course of the study, drawlessons from the successful experience of the others, the project plan and controltheory and project practice, I hope the research results of this paper can be engaged inthe project management related personnel or project management personnel, toprovide some project management practice of some help, in order to achieve theeffect of forward, that’s exactly what I expected.
Keywords/Search Tags:Project plan, Converter, Iron and steel smelting
PDF Full Text Request
Related items