| Measurement and payment, as the name suggests, is to confirm the project amount, thepayment of the contract price.A high grade highway construction process, from the initial feasibility study,preliminary design, construction drawing design, to invite public bidding, the ownersidentified (construction unit), construction units and supervision units, each link is crucial to[1]. And that many units of supervision units, construction process and the essentialimportant link key. Supervision unit through the professional supervision engineer for theconstruction unit operation supervision, inspection, verification, confirmation of qualifiedengineering measurement and payment amount, engineer under professional supervisionengineer to confirm qualified engineering quantity issued Works Payment Certificate, reportto the employer (construction unit) approval, the owner (construction unit) verifiedsignature, pay to the contractor (construction unit) project cost. Measurement and paymentmanagement engineer’s work in the highway construction especially the three control(quality, schedule, cost control) plays a key and core role.As a unit of measurement and payment management professional supervision engineer,measurement and payment work became the project overall construction process mediumChongzhongzhi is heavy, through a number of project supervision work, the measurementand payment methods also have a deeper understanding, this article take the HunchunUlanhot Expressway to the Da to Baicheng construction projects measurement and paymentwork as the background, from the actual engineering practice, according to the project ’sspecial place, the traditional measurement and payment procedures and methods to beimproved and applied to this project, and the measurement and payment method for furtherresearch. |