| Construction project change cannot avoid because of Construction project have thequality of Long-term, complexity and dynamic and any project cannot foresight and cover thechange occurred in the process of project construction. Construction change is the importantcontext of Construction project management in theoretical significance and it is the key factorthat impact of construction projects three objectives-investment, planned speed and qualityin the practical meaning. Therefore, strengthening the study of construction changemanagement has great significance for smooth achieve the construction target. Paper analyzethe literature researching on Construction project change management of domestic andinternational using literature methods, data analysis and other methods. For existing problemsin the Construction project change management, paper study the establishment ofConstruction change management system according to the idea of systems theory and thewhole process of management theory.Construction change management system is composed of forecasting system, assessmentsystem, execution system and monitoring system. In the forecasting system, paper analyzesthe change project in the method of qualitative and quantitative analysis. Applicationdependency structure matrixes based on work and related to statistical theory analyze theprobability of the change project in the method of Quantitative. In the assessment system,paper established the assessment of design program change and construction program change.The review of the design program change is primarily through the evaluation indicatorssystem as the basis of assessment and combined in value engineering theory. The evaluationindicators system is composed of the financial indicators, duration indicators, and designspecifications, process indicators and safety indicators. The review of construction programchange is primarily through the evaluation indicators system as the basis of assessment andcombined in Fuzzy evaluation principle. The evaluation indicators system is composed of thefinancial indicators, duration indicators, process indicators, quality indicators, environmentalindicators, resource indicators. In the execution system, Paper proposed different changemanagement procedures according to the different classification of types of changes, such asscope of work changes, nature of work changes and so on.Comparing to the complexity of the Construction change in practice, the study of theConstruction change have not been enough. Hoping the study of Construction change canplay the role of “initiateâ€. |