Font Size: a A A

A Preliminary Study On List Price Level Group Of Construction Enterprises

Posted on:2012-11-24Degree:MasterType:Thesis
Country:ChinaCandidate:J H FuFull Text:PDF
GTID:2232330377956440Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Since bill valuation has been implemented on July1,2003,ourcountry’s project valuation way transfers list valuation gradually from thetraditional quota valuation. The construction enterprises is one of themain bodies of Practicing bill valuation,in order to better use of listvaluation for Bidding, fully understand the advantages and disadvantagesof BQ is the first step for to beat the other competitors and obtain theopportunity in successful, is also the premise which the enterprise canmake a profit and survive. However, the enterprise quoted price’s notonly relates the possibility which is selected, also relates the rationalitythe quoted price. Therefore, the construction enterprise must considerfully own condition, project’ characteristic and the information ofcompetitors, establishing a model which can judge the Sector of theproject cost and quota price level. Only then enterprises can already notwaste the resources to quote price blindly, also can increase thepossibility of winning a bid, therefore they can standing on buildingindustry between which the competition is becoming increasingly fierce.This article analyzed our country’s construction profession list valuation tendency and the existence question, proposed that theconstruction enterprise must establish own enterprise quota andformulate a model which can judge quota price level according with ourenterprise characteristic. The research of quota price level have veryheavy significance to recognize the construction cost of the planning bidproject, to choice a reasonable Profit, to enhances the rate of winning abid.
Keywords/Search Tags:Factors, Project Cost, List Valuation, Construction Enterprises
PDF Full Text Request
Related items