With the development of reform economic system,quota valuation mode and does not conform to the development of market economy,the problems during the process of cost management,and has become increasingly apparent,in order to guarantee the healthy development of the domestic construction market,in order to cope with competition in the international market,list of quantities pricing mode as a new mode of engineering cost management begins to be rolled out across the board.This paper based on the list valuation and the analysis of cost management, etc,to the concept of the valuation model through cost management of construction enterprises,always do the objectivity of the problem analysis, scientific nature and rationality. Through literature at home and abroad for reference and learning to list valuation and cost management research achievements of relevant problems, such as, according to the actual construction cost management of enterprises use,combined with the specific case,analyze the construction enterprise in the process of project cost management,for the valuation of the valuation model through and use,for the construction unit how to better do a good job to provide reference for cost management.Suggestions to consummate the quantities bill valuation mode of construction cost management strategy. And according to the construction units in use listing cost model for engineering cost management of the process,you may encounter problems,combined with the latest development,put forward the feasible countermeasure and the suggestion. |