Font Size: a A A

The Research And Design Of Shangyoujiang Reservoir Flood Control Consultation System

Posted on:2013-01-15Degree:MasterType:Thesis
Country:ChinaCandidate:W J ZhangFull Text:PDF
GTID:2232330392456959Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
Reservoir Project is the most important part of flood control system.It can effectivelywork with the flood embankments and the flood storage regions,and give full play toflood control system’s effect on block,drain,diversion and strorage.Flood controlconsultation is a very effective non-structural measures of flood control.It is theintegration of reservoir flood control non-engineering measures.This article according to the actual needs of Shangyou Reservoir consultation workduring flood season,researched a remote virtual consultation system based on Internetenvironment.It particularly describes the basic structure,functional modules and demandfor information of the software system.It porposed a flood control consultation processand mode which take a decision support group as the core.In flood season,consultationsystem provides effective technical support to senior leadership decision-making andinstruction-issuing,and is more signficant of the reservoir flood control operation work.
Keywords/Search Tags:Flood control consultation, Decision-Support, Flood forecasting, Reservoirflood control operation, Web-based
PDF Full Text Request
Related items