Font Size: a A A

Research On The R&D Management Of The Model Car Of The CNR Changchun Railway Vehicles CO.,LTD

Posted on:2014-02-22Degree:MasterType:Thesis
Country:ChinaCandidate:W WangFull Text:PDF
GTID:2232330395999820Subject:Business administration
Abstract/Summary:PDF Full Text Request
Nowadays, with the increased investment on the railway and urban railway vehicles construction, the railway vehicles enter the golden age of the high-speed development. The Changchun Railway Vehicles Co., Ltd. gets a lot of orders, but because of the limited capacity, some of the orders are backlogged.R&D and manufacturing of the model cars is one of the design stages of railway vehicles, and the R&D and manufacturing process of model car takes about105days in the Changchun Railway Vehicles Co. Ltd., and consumes a longer time.In this paper, a comprehensive analysis of the Current model car production process in the CNR Changchun Railway Vehicles Co. Ltd. Are carried out, which includes various kinds of data as well as the current actual operation of the project, the consultation of the relevant staffs of the manufacturing process and the comprehensions of the actual manufacturing inefficiencies event. The suggestions for improvement are solicited, the problems are summarised ultimately, the process reengineering method and the coordination theory are applied to get the final solutions.Through the objective research, the R&D and manufacturing process of the model car is shortened from the usual105days to75days, which is shortened about a month and precious time for the subsequent approved production are obtained.
Keywords/Search Tags:Model car, process reengineering, efficiency improvement
PDF Full Text Request
Related items