Font Size: a A A

Problem Analysis And Counterme Asure Study Of The Attendants Of Locomotive

Posted on:2014-02-09Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiFull Text:PDF
GTID:2232330398476040Subject:(professional degree in business administration)
Abstract/Summary:PDF Full Text Request
With the railway reform of institutional mechanisms and a large number of EMU, continue to develop high-speed rail line, the locomotive crew as an important trade of the railway system has been and will assume an increasingly important responsibilities.Especially since the Chinese Communist Party’s18, the development of the country pay more attention to people’s livelihood, coupled with the railway is in a critical period of reform of institutional mechanisms, how to play the role of the locomotive system, improve the locomotive crew to ensure safety capacity, the better for the community,the masses, the railway will be faced with new issues.Segment locomotive crew management problems, speed up the construction of the locomotive crew team, improve the overall quality of the locomotive crew is desperately needed, especially with the Beijing-Tianjin inter-city, the Beijing-Shanghai high-speed railway, Beijing-Guangzhou high-speed rail, high speed rail line a large number of CDB, new equipment, new technology continues to put into application, these new changes have the current locomotive Safety management had a great impact, personnel structure has undergone great changes, the quality of personnel is not good to keep up with the railway development footsteps. For motorcycle safety management, it is necessary to adapt to the needs of the current situation, prompting the locomotive crew to master new technology as soon as possible, but also to eradicate Locomotive Safety management has long been a few problems, it can be said that, faced with a great deal of pressure.This article was mainly focused on analyzing the current status of railway locomotive crew team; generalized existing problems; dissected deeper roots and diagnosed corresponding measures. EMU workshop building under the new situation to explore, to further improve the relevance and effectiveness of the maintenance of safety management, in order to, the locomotive crew team structure, culture, management and use of, the right remedy, innovative means, better play locomotive crew team, to promote the efficiency of production and transport, to create favorable conditions for the smooth flow of transport order, and ultimately safe, stable and rail transport.
Keywords/Search Tags:railway, the locomotive crew team, status quo, analysis
PDF Full Text Request
Related items