Font Size: a A A

The Study On Stadiums And Gymnasiums Construction Strategy In Shenyang Based On Multi-model

Posted on:2012-02-12Degree:MasterType:Thesis
Country:ChinaCandidate:X L YuFull Text:PDF
GTID:2247330362953148Subject:Humanities and sociology
Abstract/Summary:PDF Full Text Request
With the continuous development of sports and country rebuilding demands., our countryregional governments take satisfies athletics training, the competition demand and the populacefitness needs as the starting point. A lot of public gymnasiums were rebuilt and extension. Sincethe huge cost in construction of stadium, high technical requirement, long cycle in build, lowutilization ratio in post-game, the fund recycling is quite difficult, thus most of them wasestablished by government and it brought heavy pressure to them. In recent years, for meet the12th National games will be held in Liaoning, increasing numbers of stadium was be built, whilethe contradiction of supply and demand in use of stadium was be alleviated, many actualproblem of investitive stadium in Liaoning province government. Such as the model ofconstruction of stadium, the low rate in operation of the project, resulting in the loss ofgovernment funds and resources wasted. Based on it, in this paper, the construction of stadiumin Shenyang as objective of study. Through the literature material method, to neaten and systemsanalysis the model of stadium at home or abroad. Use the on-the-spot investigation and expertinterviewing method. Clear up the current situation of stadium in Shenyang, to analysis themodel of stadium by diversification comparative method and summarized that the new type ofstadium construction in Shenyang under the booming of socialist economy. Provide new ideas inthe model of stadium construction for Shenyang.This article is divided into four parts to analyze the model to fit the stadium in Shenyang bythe representative from foreign and domestic it include PPP BOT and ABS and the typical caseof use side in the domestic’s stadium to find out different region, different form of the stadiummodel for enrich the typical of stadium construction in Shenyang. And then ,make differentstadium to suit different construction model, Thus causes Shenyang’s different type sportscomplexes to adopt the different construction pattern, for present sports complexes whiledisplays it the function which serves for the sports event to be more advantageous to uses afterthe game. The stadium construction will become the auxiliary booster of mass body-buildingplan.
Keywords/Search Tags:Stadium, Construction model, Stadium in ShenYang
PDF Full Text Request
Related items