Cost Management Research On The Reconstruction Project Of Jiaowang Road’s Anqing Section

Posted on:2013-01-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiuFull Text:PDF
GTID:2249330377458521Subject:Project management
Abstract/Summary:PDF Full Text Request
With China’s construction market continuously normative development, constructionproject management deepening, construction project cost control problem more and more bethe concern of the industry, many construction enterprise are all trying to strengthen theconstruction of the enterprise through project cost management to change its businesssituation, and improve the economic efficiency of enterprises.Based on the road construction project cost management as the research object,combined with AnQing period of construction project reality, the cost of the structure of thetime, according to the plan enter cost method and the cost target three ways areclassified, puts forward the AnQing period of reconstruction project cost managementproblem: lack of personnel management cost competition consciousness, lack of ZeQuanLicombination of cost management system, ignore the quality cost and time limit costmanagement, etc.; Because of the large budget planning construction work, and changedesign and other reasons, make budget preparation work often lag. Then, analyzes thecauses from the following: first is the construction plan and schedule, the selected within theframework of the project, considering their national conditions, in construction site technicalthe advanced high cost effective and sustainable security guarantees the construction scheme.At the same time, the construction project in new situation and to the new challenge, thearticle analyzes the reasons and correct the cost of the plan of management, so as to realizethe enterprise development goals. Second, the schedule, quality and cost between the threeconflicting side, and inter dependence, mutual united side. When the product of a qualifiedrate is high, the optimal rate into high, the quality of the products is good, defect repairexpenses to sharply reduce the losses, costs less cost; The progress of the projects proudoptimization, then the cost would be reduced; Also, good construction quality, rework ratecan be reduced, progress will speed up the corresponding, construction cost will also reduced.This paper also constructs the construction project cost management process, putforward the flow control agency was established, and preached and implementation process,optimize the process, to strengthen the cost consciousness, strengthening the teamwork, make the cost management of the process control. This paper finally puts forwardsome AnQing period of project management security measures: first, establish a rational and feasible cost management system, and second, set up effective cost managementorganization, and the third, from the thought up date cost management concept, the fourth,choose science reasonable cost management methods.
Keywords/Search Tags:Project cost management, Project cost structure, Cost management flow
PDF Full Text Request
Related items