Font Size: a A A

Research For Energy-saving Evaluation Based On Maturity Model For The Industrial Projects In Fujian Province

Posted on:2013-03-14Degree:MasterType:Thesis
Country:ChinaCandidate:S W WuFull Text:PDF
GTID:2249330392950283Subject:Project management
Abstract/Summary:PDF Full Text Request
The management of energy project especially those high energy consumingindustries is a key managing filed of our government. To strengthen the control andguidance of our government to high energy consuming industries to do urge it energysaving management is significant for our realizing our state energy saving target.Aspresent our government has officially list energy saving audition as a prior work forpermanent assets investment. Hower owning to the lack of workable methods andmanagement.there are many absence and blind spots in the audition.The essay establish a good connection between theory and reality. it focuses onthe industries’ energy saving audition and management,and attempts to pick up thekey factors which influence the permanent assets investment. It tries to establish ameasurable model module for evaluating the energy saving management forpermanent assets investment;it provides a frame for evaluation and improvement forenergy saving management.the module based on the analysis of the energyconsuming and management after establishment to judge the rationality of the projectand to see whether it meets the industrial policy,also judging the project design meetsthe energy saving protocol and industrial energy saving designing standard. itsjudgement system on the maturity ability is made based on the comparison of energyconsuming level and the domestic advancing level. The judgement grades is based onthe CMM theory,it defines the energy saving management into five grade from chaosto optimize and establish a upgrading system.The enery saving management level willbe the foundation of the next higher level. the procedure of the maturing of energysaving projects is also the procedure of the accumulation of managing standardsoptimizing.In using this module,we can find out the advantage and disadvantage ofthe energy saving management to forming improving strategy for the project energysaving management.Thus,we can stable and improvement the energy savingmanagement, and make sure the continuity of the improing in managing.
Keywords/Search Tags:Industrial project, Evaluation of energy efficiency, CMM
PDF Full Text Request
Related items