Font Size: a A A

Study On The Incineration Plant Location Problemwith A Compensation Mechanism

Posted on:2015-01-19Degree:MasterType:Thesis
Country:ChinaCandidate:J L LiFull Text:PDF
GTID:2251330428469748Subject:Logistics Engineering
Abstract/Summary:PDF Full Text Request
With the acceleration of urbanization, the rapid growth of the urban population,the amount of MSW generated along with the rapidly increasing. Accordance with"The Twelfth Five-Year Plan", the future of many of the city or region will createmore and more waste incineration plants. However, waste incineration plants areNIMBY-type facility, if unscientific reasonable location, is likely to lead to NIMBYconflicts. So, how reasonable scientific incineration plant sitting of it is particularlyimportant, this paper studies the sitting of waste incineration plants, mainly includingthe following aspectsFirst, the status of the processing of municipal trash and garbage in the analysis,the waste incineration is the development trend of China’s urban waste disposalindustry; secondly, analyzed the current situation of China’s compensation nearbyresidents incineration plant, summed up the current compensation case someproblems, and the establishment of a more fair and reasonable compensationmechanism; Again, the factors affecting the incineration plant sitting conductedin-depth research.On this basis, the analytic hierarchy process to determine the crude incinerationplant sitting program, namely the use of the analytic hierarchy process similarconditions, such as urban planning, geological conditions, traffic conditions,transmission lines, such as a comprehensive evaluation, can be elected Constructionincineration plant alternative point. Through the establishment of mathematical modeland Lingo programming, to a plurality of candidate was precisely location. On thebasis of the ability to consider and provide convenient services for residents and otherfactors, the establishment of a waste incineration plant to make a negative impact onnearby residents minimization problem of sitting a single objective integerprogramming model; In considering incineration plant construction, operation, andtransportation, the total cost of compensation, the establishment of a negative impacton nearby residents and the construction and operation of minimizing the total cost ofthe lowest compensation incineration plant sitting dual objective programming model,and write Lingo solver.Finally, the location model is applied to a numerical example,the proposed incineration plant sitting a reasonable solution, and the location of the results were analyzed and verified.
Keywords/Search Tags:waste incineration plants, NIMBY type facilities, compensation standards, multi-target location, mathematical model
PDF Full Text Request
Related items