Sanya H Projects Based On Value Engineering Design Scheme Selection Research

Posted on:2014-01-24Degree:MasterType:Thesis
Country:ChinaCandidate:B PangFull Text:PDF
GTID:2252330392473438Subject:Project management
Abstract/Summary:PDF Full Text Request
Based on real estate cost management system knowledge as a guide, using avariety of integrated science is introduced in the methods, including statistics,economics, project management, project design phase of the cost on scientificresearch and analysis. And at home and abroad in recent years for reference of theadvanced theory knowledge, sanya entity project launched a series of real estatedevelopment and design phase of the cost control, for the future to develop the newproject, cost saving and energy for the enterprise to provide powerful basis.This paper studies the key lies in the value engineering theory better applied inactual project work, careful analysis of the value engineering in real estatedevelopment practical application feasibility and maneuverability. Through the HTWproject cases get demonstration.H project is tourism real estate projects, with China’s tourism real estate ofgradual development, more and more real estate company consists of residentialprojects to the tourism real estate transformation. Different from the residential realestate, tourism real estate is business complex complex, it is composed of manymonomer of project. The huge amount of design and development cost and operationcost, need later high operating income to profit. So the cost is the beforehand controlof tourism real estate development project is the most important, which will determinewhether a program is not the key to success.In order to make the data more reliable, more have specific aim, in the schemedata collection process, through the comparison and selection, find differentexperience on three experts, the design phase of the three different schemes scoringfunction. For different experience of experts, gives the corresponding weight. Thusgain a series of data, and finally through the value engineering formula that dataconclusion, the best scenario was selected. As the design phase of the prior controlprovides a strong basis.Through the actual project argumentation, and now H project of actual operation,is far superior to the similar products in its function set more reasonable, cost more.
Keywords/Search Tags:real estate, Cost, Planning and design, Value engineering
PDF Full Text Request
Related items