| Engineering item in the highway construction because of its engineering invest greatly, technique request Gao, moderate communication extensive, internal structure complications etc. characteristics, constuct whole process to exist a great deal of indetermination factor in the period in the item.These indetermination factor in great quantities the existence continuously produce, the influence brought also pushes forward along with the engineering but continuously change, from here constuct to the engineering item of smooth implementation creation prominent influence.If not the ability gives a full value to these risk factors and not be handled properly, will bring engineering owner and construction unit the loss that can not estimate.Therefore, the risk management is to promisean important factor canning complete smoothly engineering item.Water electrician the distance item is economic foundation industry and infrastructure, its importance is people consensus, large numbers of independent water electricitiesdevelop company and river valley to develop the development that the companies concentrate on water electrician distance item.But water electrician distance’s constucts the indetermination of constucting the period long and national policy, social milieu and item oneself existence factor is more.Constuct process in the item in, accurately identify the risk factor of item oneself creation, and adopt the appropriate risk processing measure,can reduce item loss in the biggest limit, carry out income to maximize.This text pulls water electricity station, Yang Fang Gou with Ya Long Jiang’s cardwater electricity station of enter field transportation appropriation highway:The item risk management of the card highway’s engineering is a research object.The importance that introduced the card engineering item construction background in highway and item first, to card the basic circumstance of highway and entrust a management style to carry on an outline.Secondly the synopsis introduced a risk management theory and it is in thedomestic and international development and carry out in the item to card highway according to the risk management theory process in the risk factor that may meet carry on analysis, and to how do these main risk factors guard against and evade to carry on a study.Identify to the card risk in highway programming, risk at the same time, the risk analyze evaluation, the risk should supervise and control a series of risk management step of etc.to carry on a programming to the moderate breezes insurance and entrust risk process and risk management of management unit to particularly carry on analysis towards entrusting management style descending of.Entrusted a management style professional advantage to fill up the weakness of theitem development business enterprise human resource shortage because of it.Currentlylocal water electricity profession’s entrustsing management is being placed in a beginning stage, this text concentrates on the application study of the card item risk managementof highway, to strengthen item owner with entrust the risk of managing the organizationto guard against consciousness, tally up to entrust risk management experience in the management, raise the whole item management level, have definitely practical value. |