Font Size: a A A

Case Study Of Management Communication On SANREN Project In CW Company

Posted on:2014-08-18Degree:MasterType:Thesis
Country:ChinaCandidate:D L WangFull Text:PDF
GTID:2252330425477533Subject:Project management
Abstract/Summary:PDF Full Text Request
After entering21st century, International shipping market is gradually become standardized and profession, he competition between shipyards became fierce. The shipping repair industry in china is facing unprecedented opportunities and challenges. If the shipyards want to gain a firm foothold, they should do focus on communication management when performing plan function, leadership function, organization function and control function,.This thesis described HSE accident and problem happened in the process of project running. The author learning theoretical knowledge and consulting related data. Analysis the management problem qualitative. Because of internal and external communication block, the "SANREN" project runs hardly. The author proposes the relevant suggestions and countermeasures.Finally get out the conclusion, because of the internal communication is not matching, transverse communication blocked and the external do not well understand customer’s demand, which make project goes disordered. The author think the company should take the customer demand as the guidance, set the organization to harmonize department work, make the communication mode consolidate to the organizational structure, which can accelerate company goes in high-speed.
Keywords/Search Tags:management communication, communication block, organizationstructure
PDF Full Text Request
Related items