Font Size: a A A

Study On Time Control Of Tianjin Tong An Dao Pedestrian Bridge Engineering Project

Posted on:2015-02-14Degree:MasterType:Thesis
Country:ChinaCandidate:S M LiFull Text:PDF
GTID:2252330428951790Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Due to the deeply reform of the government in China in recent years, relevant aspects ofthe construction industry also did a lot of trial and efforts, especially for acting system on theagent-construction system, the engineering project is mainly done by the governmentbidding agent. They will choose the one who has the corresponding qualifications and canbe of professional level of engineering construction to construct and manage the process ofthe engineering project. The trying of agent-construction in the most area of China hasmade great progress and development. and agent-construction is especially widely used inmunicipal engineering. On the other hand, because the agency system in our country is verylarge and complex, over the years, the government investment projects are of big loopholesin management rules, and project capital loss seriously. Therefore, that the research on thatthe good investment control of government investment projects is worth.Along with the development of Chinese production, the construction industry becomesprosperity and develops boomingly, but the project time management in our country,especially the level of project time control is very limited. There are a series of problems anddeficiencies, including internal mechanism is not sound, the control means is not clear, theeffect is not obvious, the unclear responsibility allocation, the assessment mechanism is notsound and so on. So the study of project time control and the attempt of the time controlmeasures are very necessary. Much of the effort of time control involves analyzing therelationship between the consumption of project funds to the physicalwork beingaccomplished for such expenditures. The key to effective time control is the management ofthe approved time baseline and changes to that baseline.Through to the Tianjin municipal engineering construction of Tianjin municipalconstruction development company.,——Tianjin Tongandao Pedestrian Bridge engineeringproject time control, on the one hand, to analyze the influence factors of the project timecontrol, through the analysis of the internal control mechanism of the construction unit, thecompany’s internal quota, and internal and external environment of the project and so on, toananlyze what are the sensitivity of factors of the time control. On the other hand, it is toanalyze the effective time control measures, through the concrete in the process of project construction time control methods of analysis, looking for effective time control method.Then analysis the effect of the pedestrian bridge engineering project time control. Throughthe analysis of the effect, we can make sure the value of effective time control.
Keywords/Search Tags:Municipal Engineering, Agent-construction System, Project Time Control
PDF Full Text Request
Related items