Font Size: a A A

Application Of Project Management In The Construction Of Softswitch

Posted on:2013-10-11Degree:MasterType:Thesis
Country:ChinaCandidate:H GuoFull Text:PDF
GTID:2269330398996216Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Along with the telecommunication enterprise restructuring, td-scdma trial commercial, communication enterprise whole business operation and a series of reform policy implementation, our country communication market environment has taken place great changes. China mobile, China telecom, China unicom three operators with business structure change, the adjustment of business structure of network construction, put forward new demands, the project construction management level also puts forward new requirements, engineering management needs to achieve the routing, normalization, standardization, to ensure business development have fresh blood. Communication engineering construction is an important part of telecom enterprises, communication engineering construction management is the telecommunication operation business management foundation, the communication of project construction and management standardization for the normal operation of the communication network and the normal development of communication service plays an important role.Inner Mongolia company’s communication construction project covers the company’s basic network, infrastructure, enterprise information system, etc, has the quantities, to participate in the unit and construction conditions of Inner Mongolia autonomous region is vast, complex terrain, the construction time is short and geography, climate and natural environment characteristics. Construction project management requirements of saving investment, construction period is short, the engineering quality is good, and investment, time limit for a project and quality is a policy both of unity and conflicting target system. Therefore, the project construction management departments need to continuously improve the level of management, regulate engineering construction project process, strengthen the construction of the technical specification and process requirement, to improve operation management ability.In this paper, through the project management throughout the soft exchange project construction, puts forward communication engineering construction company will engineering construction projects of all process, all construction activities throughout the soft exchange in engineering construction projects, the project management, project design, construction and acceptance, assessment after thinning five stages, and puts forward the optimization Suggestions, to better adapt to the Inner Mongolia company project construction management challenges and requirements, to improve project management standard, the smooth of project construction and management processes, strengthen project technical specification and process requirement, to finish the project construction, the control project quality to provide security.
Keywords/Search Tags:project management, soft exchange, progress management, quality management, cost management
PDF Full Text Request
Related items