Font Size: a A A

Project Investment Plan On Coal Gangue Power Engineering By BXE Corporation

Posted on:2014-03-17Degree:MasterType:Thesis
Country:ChinaCandidate:J S ZhangFull Text:PDF
GTID:2269330401959070Subject:Business administration
Abstract/Summary:PDF Full Text Request
Electric power is in advance with economic development. Today, China is still mainly inthe coal-fired power. A large number of coal gangue have been produced in the coal mining,washing and processing process, which occupy the land and pollute the environment.BXE is a company with a new energy as the core of the listing Corporation, plans toinvest in a new2x300MW power plant which comprehensive utilizate coal gangue bycirculating fluidized bed. This paper is an investment business plan which aimed at the project2x300MW power of the company, to provide the basis for the company to apply for the loanor getting a venture capital investment, to improve the science of investment decisions andproject benefit.Power market firstly, where the project is located in Meizhou City, Guangdong, isdiscusses with the industry environment and market space of the project. Secondly, fuelmarket environment and fuel transportation condition are analyzed which are the main factorsto influence the benefit of project, and the project procurement, fuel transportation scheme arecarried on the discussion. Then project process is selected using the technology comparativeanalysis, and the generation conditions of the main equipment are put forward. Then financialmanagement analysis and evaluation of the project benefits are done using the project analysisand valuation. At last the project risk is analyzed and preventive measures are put forward.Based on the analysis of research, the electric power market demand space of the projectis relatively broad, coal gangue and anthracite coal procurement market is stability,comprehensive utilization of coal gangue power generation using the circulating fluidized bedtechnology can get high economic benefit, good social benefit, and the project can get thesupport of the national policy, so the project have the characteristics of obvious advantages,technical feasibility, risk control, better profitability. Integrated a variety of factors, the projectinvestment is worth.
Keywords/Search Tags:coal gangue power generation, business plan, benefit, risk
PDF Full Text Request
Related items