Research On The Project Schedule Management Of Surface Treatment Of Wastewater

Posted on:2016-06-16Degree:MasterType:Thesis
Country:ChinaCandidate:G S ZhangFull Text:PDF
GTID:2271330482451585Subject:Project management
Abstract/Summary:PDF Full Text Request
Schedule management is the key management that ensures the project to be completed on time.The common feature of military construction project is highly prescriptive,planning, timeliness, confidentiality. For various reasons, in the Qinghua company construction project,environmental projects’s implementation process often restrict the overall progress of construction projects,and become the bottleneck in the progress of the construction project management,making a considerable number of construction projects often have tight late rush before the loose schedule,and some even can not be completed on schedule, and even affect the weapons and equipment research and production and the development of enterprises. It has a very important practical significance to environmental engineering of Qinghua company construction projects in progress control management.This article firstly analyzes the research background of schedule management of surface water project of sewage treatment, then analyzes the current construction projects of Qinghua company schedule management status and the factors influencing the process. Based on the conclnsions, progress of the project scope of schedule management of PSHT project of sewage treatment were defined. By using earned value analysis, project plan evaluation and review technique (PERT), critical path method (CPM), critical chain project management (CCPM), project deviation method of causal analysis chart, process control process control applications, finds advanced theory, system control method and application of schedule management tool for effective integration in the field of project management of surface water, Secondly, using the related theory and method of project schedule management to develop a project schedule and optimized, finally, the use of management principles and methods of modern project management to control the project progress.The full text based on the comprehensive analysis of surface water project of sewage treatment, combined with the characteristics of environmental engineering of the project and its impact on the construction progress of the project, puts forward the new thought and new method of schedule management in construction projects, to provide experience and guidance for the scientific management in Qinghua company construction projects. At the same time, this can also provide reference for other enterprises encountered similar problems in construction project management solution.
Keywords/Search Tags:surface water, sewage project management, progress management, control
PDF Full Text Request
Related items