Font Size: a A A

The Coal Mine Ultra-high Water Filling Station Device Parametric Design And Virtual Assembly

Posted on:2016-04-27Degree:MasterType:Thesis
Country:ChinaCandidate:J H ZhangFull Text:PDF
GTID:2271330482459344Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
Coal is an important raw materials and energy for national industrial production,and filling mining technology as a green mining technology can effectively improve the coal recovery rate of coal, to achieve full utilization of resources, and can effectively protect the surrounding natural environment. The new high water filling mining technology can effectively ensure the "three under" mining safety, the maximum recovery of mineral resources, to extend the mine life of the mine, while protecting underground, surface environment, reduce surface subsidence. High water filling technology has a relatively simple process systems, the initial investment is low, good filling effect and the like.The use of high water filling techniques mainly relying on building on the surface of the filling station and pass into the mine filling pipe, and the high water filling station is the most important part. Combining technology and development status Jizhong Energy Fengfeng Group Kowloon mine high water filling station mechanical equipment design, first introduced the development of the coal mine filling technology, high water and high water filled filling process and filling station the equipment layout for a detailed description. The second section describes the principles of parametric design and development process, and this article apply to the SolidWorks software are introduced. Mine design drawings by reference Kowloon high water filling stations, using SolidWorks Software Drawing build a parametric model of the main filling station equipment, and thus to build the entire system parametric design model library is based on the use of a design table method applied to the high water filling equipment for parametric design, implement standardized design non-standard equipment. Assembly function using software throughout the construction process to simulate the filling station, to identify potential design problems and propose appropriate solutions. Finally the entire system to determine the order of assembly of the device, play a guiding role in the actual project.
Keywords/Search Tags:High water filling, SolidWorks, parametric design, model library, virtual assembly
PDF Full Text Request
Related items