Font Size: a A A

Xinyu Jingkai Road By Municipal And Highway Different Comparative Valuation Analysis Patter

Posted on:2015-04-27Degree:MasterType:Thesis
Country:ChinaCandidate:L CaiFull Text:PDF
GTID:2272330422477540Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
According to the different system between the investment and management,inour country the basic investment construction project including roadways and bridgesare considered municipal construction and traffic construction projects, one is in themanagement of housing and city-country construction dept and the otheristransportation dept. Accordingly, in the construction of roadway bridge, it formmunicipal highway engineering two different estimate pattern, each has the wholeestimating methodand the estimating budgetary norms,then has the different norms inconstruction cost and controlling. In estimating, municipal engineering mainly accordto Instruction Engineering Quantities Estimate Standard(GB50500-2008),highwayengineering mainly accord toHighway Engineering Infrastructur Budge Workout Way(JTG B06-2007);As to estimate ration,municipal engineering mainl accord to rationswhich prepared by departmentt in Province or city, highway engineering ration is thesame in the whole country. The same roadway-bridge projec, using the differenceestimate pattern, come into the different effect. There are large different in the costingmanagement document/biding document and list of construction evaluation. thenaccording to the different of costing norm and procedure,even using the samemanual work material,machine produc,came into the different effect in engineercost and evaluation..The main reason is that they are not in the same department inration.Even in the same ration, if there are differences in manpower,material andmachine wastage, there are differences in part charge item rate and estimate procedure.This article samples roadway-bridge project, taking analysis of cost management andestimate system, construction norm between municipal and highway engineering in thepresent roadway-bridge project, finding out the relationship and difference.Thesedifferences in the two system is because of the diffferent charged department,estimatemethods and diffetent ration. Then choosing the typical projects:the xinyu jingkai road,preparing construction quantity listing, budgetary according to the different estimatepattern, taking furthe analysi and comparison of norm and construction cost betweenmunicipal and highway engineering according to the result.
Keywords/Search Tags:Municipal, highway, estimate pattern, roadway bridge, cost, analysiscomparison
PDF Full Text Request
Related items