Font Size: a A A

The Early Stage Study On Landscape Springs Project

Posted on:2014-05-01Degree:MasterType:Thesis
Country:ChinaCandidate:F ShengFull Text:PDF
GTID:2272330428479114Subject:Project management
Abstract/Summary:PDF Full Text Request
Zhang Qiu is located in mid-latitudes, belongs to the north temperate zone humid regions LuHuai area. The summer heat, winter cold, autumn day high air. Landscape springs project is located in ZhangQiuShi area, all around a street, east tang kingdom, dragon scenic mountain in the north, to the west side of xihuan road, south to fuqian new road. Proposed district is located in ZhangQiuShi make north road south, double to visit the west, house before the new road north, xihuan road on the east side. Special geographical environment to develop real estate projects have different characteristics, in this paper, by studying the landscape water city in the early period of the project planning, provide reference for similar projects.This paper uses the basic theory of project management knowledge, based on the project planning phase, the landscape city, a phase of the project area based on the analysis of the geological environment condition. First of all, the scope of the project for the targeted strong, deep insight into the content of project implementation; Second, the implementation progress of the project construction has carried on the detailed planning, including project construction safety, environmental protection measures and the resource configuration details; Finally, under the special environment on items that may exist targeted analyzed the construction technology and quality risk, and gives the corresponding countermeasures, and laid the important foundation for the project formally began.Through research, this paper sums up the real estate project in a complex geological environment plan in advance can draw lessons from the experience of:(1) the scope management should follow the following train of thought, the principle of first clear scope, scoping, secondly to refine the scope of distribution, and the third is the site management content;(2) the content key project plan should include a schedule plan, resource plan and safeguard measures;(3) with such projects corresponding to the main risk should include the technical risk and risk and the matching quality.
Keywords/Search Tags:Landscape springs project, project scope management, project plane andguarantee, risk and counterplan
PDF Full Text Request
Related items