Font Size: a A A

The Construction Quality Evaluation Study Of110KV Transformer Substation Project In Mafang

Posted on:2015-04-12Degree:MasterType:Thesis
Country:ChinaCandidate:P F ZhangFull Text:PDF
GTID:2272330434959630Subject:Project management
Abstract/Summary:PDF Full Text Request
The construction of transformer substation project is an important part ofconstruction of power transmission substation project and the construction quality oftransformer substation project has great import effects on the goal of entire powertransmission project. Good construction quality can significantly decrease the operatingand maintenance costs of power transmission project. Thus, building a scientific andreasonable quality evaluation system for substation construction and choosing anappropriate evaluation method to judge the construction quality of substationconstruction have become the common goal substation projects builders based on thecharacteristics and actual situation of the substation construction.This paper studies the construction quality of substation construction project. Theevaluation index system and fuzzy comprehensive order relation evaluation forsubstation project construction quality were proposed based on collection of largenumber of documents and characteristics of substation projects in this paper. This paperconducted a comprehensive evaluation study for construction quality of Mafang110Kvsubstation project and calculated the construction quality evaluation value of thissubstation project based on the quality acceptance criteria of Mafang110Kv substationconstruction projects. According to the evaluation results, this paper formulatedconstruction quality control measures for Mafang110Kv substation project to ensure thatthe construction of substation project can be carried out smoothly as planned and qualitystandards, which has some reference and guidance to improve the construction quality ofsimilar projects in the future.
Keywords/Search Tags:construction quality, substation construction, ordering relation, fuzzy, comprehensive evaluation
PDF Full Text Request
Related items