| With the lack of fossil energy, environmental protection is important more andmore. So the new form of energy must be considered, and the area offshore windpower resource is rich, the potential is enormous. Wind power is the most mature inthe field of new energy technology.Offshore wind resources are rich in our country,10m height about200millionKW wind power resources available, the sea fan is limited by the developingcondition of the lack of professional installation of Marine resources, Marineconstruction cost is high, the risk is big.This topic will be according to the domestic offshore hydrological conditions,domestic hoisting of the fan model enterprise6MW and sea fan experience, focus onhow to define the function of the offshore wind power installation vessel, the analysisof each main function, put forward deck configuration scheme planning overallarrangement, main parameters design of ship; According to the standard configurationof various functions, the installation of ship design condition and load conditions, theintact stability study on the ship. Research conclusion is given, to provide thereference for the future of wind power installation vessel design.1. Study on the sea fan different combination installation, as well as domesticoffshore address conditions, installed offshore wind power are given ship work scope,weight lifting equipment, such as geological conditions of the overall technologyresearch input conditions;2. Study on the offshore wind farm on the driving performance andself-propelled performance and hoisting performance requirements, differentequipment hoisting crane configuration requirements, determine the deck layout.3. According to the experience at home and abroad and the specificationrequirements, study on intact stability analysis, optimization of deck arrangement;4. Evaluate the optimization results, ship arrangement are given;... |