Font Size: a A A

Research Of Project Quality Plan And Control For ZHOUG YANG FUDI Project

Posted on:2016-03-20Degree:MasterType:Thesis
Country:ChinaCandidate:J M ZhengFull Text:PDF
GTID:2272330461488805Subject:Business administration
Abstract/Summary:PDF Full Text Request
Project quality management in our country is still at the stage of management model, and still in the stage of extensive management. Poor comprehensive quality management consciousness leads to the contradiction between the formal management and quality management of the enterprise becoming more and more prominent.In reality, most owners are directly involved in the project quality management, hence the success of project quality management depends on the level of management of project owner.With the rapid social development, the construction quality of the products gets more and more attention of the general public, although many large and medium-sized enterprises introduce international advanced quality management mode, the quality of the domestic building products still has quite a lot of problems, as well a large energy consumption.Substandard engineering may shorten the service life of the product, and users will also suffer immeasurable direct economic losses and indirect economic losses, at the same time that may cause great waste of state resources. Therefore, the development or construction of enterprise in quality management, making efforts to improve the level of quality management is of vital importance.This article talked about the "ZHONG YANG FU DI AREA A 10#" project, the project is developed by XX real estate development company. The basic thought of the research is theory combining with practice, to put the theory in the actual work, to analyze the existing problems in the practical work, to find out the reasons, to put forward a practical solution, and to test and perfect the theory again in the practical work.As for writing methods, questionnaire method, case analysis, system analysis, theoretical and practical analysis is largely adopted. Theoretical and practical analysis method is the most basic method in the practical work.Through more than one year’s exploration, this article analyzed the basic situation and existing problems of Area A 10# building, formulated a project quality plan according to the reality; established a system assurance system and an effective quality management organization; established quality control system, realized a quality control and inspection mechanism, gave a detail description about how to establish a construction standard and to realize the defect avoidance in all professional areas, further found the inadequate aspects in use, and make up the gap to drive a continuous improvement of the quality management system and engineering product’s quality.Basic conclusions:Quality management of the construction projects involves many links including designing, materials, people, engineering, etc., it plays a significant role that to put the comprehensive quality management into the project quality management. According to the demand of zero defect theory, we should start from the demand of customers, it is found in practice that as long as we combine with the actual, at each link of quality control to "do things right from the start". Human effort is the decisive factor, to realize the goal of quality plan is not a difficult thing. The construction quality management contains many specialties and processes, in the management of construction quality, pay attention to the interface management work and do it well is very importance. Quality is the core of company competitiveness, in construction projects’ quality management, quality plan and control play a very importance role in quality management, in the implement of quality plan and target control system, we shouldn’t only do the formality work, but to put into effect every cycle, really practice the management according to law, only in this way can we improve effectively the quality management performance of the construction projects.
Keywords/Search Tags:Quality target plan, Assurance and control, Customer requirements, Zero defect
PDF Full Text Request
Related items