Font Size: a A A

The Study Of New Project Construction Quality Control Process Improvement About GUI ZHOU BIJIE AIRPORT

Posted on:2016-05-09Degree:MasterType:Thesis
Country:ChinaCandidate:W X ZhangFull Text:PDF
GTID:2272330461971810Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Project experience in the world in recent years the number of major quality accident is increasing, under the condition of market economy, enterprise is the main part of the engineering quality behavior, guarantee the project quality is the responsibility of the enterprise.Engineering quality control management ability and the economic and social development in our country and international advanced level, there is still a large gap compared is mainly due to the lack of engineering quality control theory in practical effective application in the engineering construction process, enterprises lack of comprehensive management theory to guide the engineering quality control, based on this, this article in guizhou bijie airport project construction quality control, based on the present situation analysis put forward the improvement scheme design quality control in the construction process, studies the improvement project quality management plan implementation suggestion.Based on the research status and the application status of construction quality control and supervision, the of construction quality control and supervision and the statistical techniques and statistical methods of construction quality control and supervision, this paper firstly discusses the status of gui zhou bi jie airport new project construction by a systematic investigation, analyses the status of quality control and supervision about construction preparation and process of gui zhou bi jie airport new project construction,discusses key issues above construction preparation process and construction process, which mainly include there problems respectively. Secondly, this paper conducted the evaluation and selection process improvement, presented a relatively complete evaluation and selection process and evaluation of the overall contractor model based on the principles of BPR and systems engineering; And this paper proposed a complete documentation of construction planning and review process according to the ISO9000 standard and the PDCA cycle principle;And this paper presented a the pre-assessment program about construction preparation process based on the pre-control chart. Moreover, this paper proposed the construction units, supervision units, construction units and other parties combined quality control and monitoring processes according to the BPR and quality control theory;And this paper presented a quality control program about the construction process based on the pre-control chart. This paper proposaled a different degree of quality problems complete disposal processes according to the BPR and PDCA principle.
Keywords/Search Tags:Construction quality, Control and Supervision, BPR, Abnormal distribution, Thepre-controlchart
PDF Full Text Request
Related items