Font Size: a A A

Construction Planning Of Power Distribution Network In Nanchang City (Economic-technological Developing Area)

Posted on:2015-10-17Degree:MasterType:Thesis
Country:ChinaCandidate:Y H XiaFull Text:PDF
GTID:2272330467470081Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
By the open area power distribution network construction and transformation of "115",there is a certain degree of ascension in the grid structure, power supply capacity etc.But atpresent,with the development of economy,the open area of power distribution network can notadapt to the load demand of development,existing problems such as the weak structureetc.Therefore,the preparation of the open area powr distribution network"125"planningreport,guiding by the open area in the construction of power distribution network, the openarea has important significance of power distribution network for providing power supplyservice quality of regional economic and social development and improve people’s livingstandards.The planning to guide the transformation of the open area by the construction of110kVand below power distribution network,ensure coordination at all levels of distribution networkand the development of social economy;optimization by the open area grid structure levels ofpower distribution network,the improvement the week of10kV and above power distributiongrid;meet the load demand.
Keywords/Search Tags:Power distribution network, construction Planning, increase for load demand, grid structure, power systems
PDF Full Text Request
Related items