Font Size: a A A

Redhill Hydropower Project Site And The Main Building Comparison And Selection

Posted on:2015-07-25Degree:MasterType:Thesis
Country:ChinaCandidate:J Y GuoFull Text:PDF
GTID:2272330467486326Subject:Water conservancy project
Abstract/Summary:PDF Full Text Request
Water Resources and Hydropower Engineering design process overall dam, dam type selection and project pre-feasibility study stage layout is a very important task to choose whether reasonable layout directly affect the effectiveness of the project, or even related to the success of the project. Overall a reasonable choice dam, dam type and engineering layout is a key factor to reduce investment. With large, medium-sized hydropower construction, technology development under the existing conditions, must be made on the hydropower dam, dam type of rational choice, the overall project layout made more reasonable and practical layout scheme, which will construction has important significance.In this paper, the research background Redhill Hydropower Station, considering the multiple effects of the regional geology, geological conditions of the reservoir area, Dam Area geological conditions, traffic conditions, construction conditions, hydrological conditions, its site selection, dam type selection and engineering Detailed analysis and comparison of the overall arrangement of the case so choose to do, and eventually made economically rational technology, in line with the objective and scientific building programs. This study also planning similar projects in the future provide a useful reference.
Keywords/Search Tags:Dam, Dam type, Plan layout, general layout, comparison and selection
PDF Full Text Request
Related items