Font Size: a A A

Design And Implementation Of Aike Building Auto-control System Integration Management Platform

Posted on:2015-12-10Degree:MasterType:Thesis
Country:ChinaCandidate:X Z ShenFull Text:PDF
GTID:2272330467486749Subject:Software engineering
Abstract/Summary:PDF Full Text Request
The objective of Building Equipment Automatic Control is to conduct comprehensive integrated management for all the equipment resources and public service facilities of the building. Modern advanced building automatic control system’s operating system and equipment running management software both have traditional graphic text window surface and dynamic graphic surface, to realize high reliable and efficient system management function for users.This paper discusses the design and implementation of Aike Building Equipment Management System with the above background. This software is a user-oriented, open, standard and modeling software. The whole system includes traditional text operating software, graphic operating software, data collection software, graphic alarm software and graphic tendency chart analysis software. The above software can be used together conveniently and freely, to help the user achieve enough data from the equipments and make decision. First, from the view of developing foundation, it discusses building automatic control system’s features and technology situation, the development of distributed control technology and main achievements. Then, from the view of software engineering, it gives detailed discussion and summarize to the system’s demand analysis, software system design, system configuration requirement, main programs programming and system testing. The paper discusses the system’s main developing and testing technology.This system has been finished developing and was implemented in several building projects with good effects and very positive feedbacks from the users.
Keywords/Search Tags:Building Automatic Control, Distributed Control, Network Control
PDF Full Text Request
Related items