Font Size: a A A

Construction Bidding And Tendering Management Development Process And Its Application

Posted on:2015-12-08Degree:MasterType:Thesis
Country:ChinaCandidate:X J ZhangFull Text:PDF
GTID:2272330467984501Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
With tilt accelerate infrastructure and national policies, EPC project management model increasingly popular, replacing direct investment by the government, the formation of the practice of project management office. Successful realization of the project sub-significant, direct the management decided to implement the project objectives. Excellent subcontractors with more advanced productive forces, bidding to make excellent subcontractors have more opportunities to participate in the tender the project, are more likely to reduce the construction cost of the project. But another participating units will inevitably lead to an increase in transaction costs increase the tender, the number of tender bids outstanding benefits no longer with subcontractors increased with the increase, so the optimization is to improve efficiency in terms of time bidding elements of transaction costs effective way.This paper is divided into the following sections:firstly describes the background of the article and ask questions. Second, through theory construction project bidding for economic analysis, and based on auction theory construction project bidding evaluation method for optimization. Third, in order to benefit as the observation point, combined with the development of project bidding process, by contrast, the effect of different stages of project bidding characteristics and time elements of the project bidding and bidding transaction cost effectiveness. Fourth, the combination of the present stage of construction project bidding procedures, analyze the various stages of the time element, the proposed optimization companies bidding time element of the program. Fifth, Chongqing Zhongwan highway to the bidding process, for example, introduced the reform program in engineering bidding, and to analyze the impact of the programs on the project bidding tender transaction and transaction costs. Finally, conclusions and outlook of this article.Five articles about the proposed project bidding time optimizations, including priority organize temporary project implementation, control engineering priority organizational construction design, optimization BOQ preparation methods, and establish a qualified subcontractors and material suppliers directory, use of scientific evaluation methods. These five programs were at different stages of the project bidding optimization, to ensure the quality of the premise of project bidding, can effectively save time for bidding, has important practical significance.
Keywords/Search Tags:Construction project bidding, cost-effective, transaction
PDF Full Text Request
Related items