Font Size: a A A

The Study On Selection And Evaluation Of Construction Project Of Near Zero Emissions Renovation Of TaiCang Thermal Power Plant

Posted on:2016-03-28Degree:MasterType:Thesis
Country:ChinaCandidate:B LiFull Text:PDF
GTID:2272330470474937Subject:Project management
Abstract/Summary:PDF Full Text Request
The construction project of Environmental renovation of GuoHua TaiCang 2×630MW Units is to make soot, SO2 and NOx emission concentration to meet the "thermal power plant air pollutant emission standards"(GB13223-2011) emissions standards and further meet the Shenhua Guohua Power Company "green power generation plan" near zero emissions requirements.Evaluation of the project before the project investment decisions is essential,it is an irreplaceable role in investment analysis and decision-making is an important part of the work,it is also indispensable. At the same time, it can provide scientific evidence for decision-making of the project. Firstly, the background and significance of the research are described and summarized the relevant literatureat home and abroad, systems analysis and elaboration of the theories and methods of pre-project evaluation; Secondly by introducing running status of environmental protection equipment of Guohua Taicang Power Generation Co. Ltd., discusses the necessity of project construction; Then analysis the construction project of Environmental renovation of GuoHua TaiCang 2×630MW Units in detail from the technical aspects; Finally analysis the construction project from the social, environmental, construction, investment estimate and economic aspects; at last we come to the conclusion that the construction project of Environmental renovation of GuoHua TaiCang 2×630MW Units is reasonable and feasible.
Keywords/Search Tags:environmental renovation project, evaluation, technical analysis, economic analysis
PDF Full Text Request
Related items