Font Size: a A A

Design Of The Top Arrow Bundle Automatic Strapping Machine

Posted on:2016-10-05Degree:MasterType:Thesis
Country:ChinaCandidate:S N ZhengFull Text:PDF
GTID:2272330470953187Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
The packing of the pallet is a new situation of modern logistics transportation packaging.lt have a lot of effect,Such as can effectively improve logistics efficiency, improve the utilization of position, reduce loss of goods and save transportation cost.Adopt the way of the top bundle can effectively adapt to changes in packaging pallet height and Strapping pallet of large size, high binding efficiency.That has become the main form of pallet strapping.Therefore, carry out the research on the key technology of the top arrow bundle wear large tray strapping machine have very important significance.According to the big size and require bundling machine to adapt to different height and the Strapping force can be adjusted of the flat pallet pallet strapping.Proposed scheme of the design of the top arrow bundle strapping.Design the process of top bundle strapping machine.The composition of the machine is strapping head,lift platform,column frame,conduction band orbit,reservoir system and electronic control system.Use Solidworks software to complete the virtual prototype.Strapping head is the core component of top bundle strapping machine.The composition of the strapping head is cam component,three claw device, isolator,heat platform,tensioning mechanism and back belt mechanism. Use the principle of coordination of executive bodies,the production process of the bundle and tie up of arrow,the method of working cyclic chart design, design the machine working cycle diagram carefully.Use multi-motion curve to optimize the profile curves of cam of cam group.In order to achieve the machine without the impact of the powerful bundled.The top arrow bundle wear automatic strapping machine using6motor control to achieve the machine work.According to the need of multi motor control,select the PLC FX1N-60MR and assign the PLC each I/O port,design the automatic binding process of machine.Calculate the movement parameters of each component and select the type of every control motor.
Keywords/Search Tags:Fully automatic strapping, The top arrow bundle wear, Strong strapping, Design of workcirculating diagram
PDF Full Text Request
Related items