Font Size: a A A

Post Evaluation Of Taiyuan County Power Grid Backup Distributed Construction Projects

Posted on:2016-03-26Degree:MasterType:Thesis
Country:ChinaCandidate:C L WangFull Text:PDF
GTID:2272330470971179Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
Power system is a direct service to the national economy and people’s lives critical infrastructure, safe and stable operation of the power system is economic development, social stability important safeguard. County-level power dispatch system is control and command center of the county utility power system operation, bear run organization, directing incident handling and restore power and other important task is the core institution safe and stable operation of the power system. Guarantee uninterrupted power dispatching system is running, is an important prerequisite for the protection of power system security. With the continuous development of the power system and the continued progress of the society, the reliability of the electricity supply, continuity requirements continue to increase, and thus the reliability of power dispatch is also put forward higher requirements.This paper analyzes the current situation related to Taiyuan grid scheduling, including network automation to run the status, and a communication system substation situation, on the basis of the status quo has been analyzed, the overall design of the alternate scheduling system, the effect of the operation carried out after completion of the project analysis, and finally the whole Taiyuan County Power Grid backup scheduling scheme has been designed to retrieve an item, and then a clear-building programs Taiyuan County Power Grid scheduling system backup, respectively, from the standby SCADA systems, automated data backup scheduling analysis, event handling, network functions and structural aspects of Taiyuan County Power Grid backup scheduling system for functional analysis, the design gives the corresponding conclusions can spare Taiyuan Power Grid construction scheduling system for reference. Then after the given Taiyuan County Power Grid scheduling system backup project evaluation index system based on the principles given evaluation system Taiyuan County Power Grid project scheduling system backup, and select the Fuzzy Analytic Hierarchy Evaluation Act as an evaluation method using fuzzy AHP method can solve the case of the qualitative transformation of quantitative difficult. After that, the situation before and after backup Taiyuan County Power Grid scheduling system project construction empirical analysis, evaluation results are given before and after the construction of the final evaluation results are given for the recommendations. The results can be related to the article to provide a reference for the construction of county-level power backup scheduling system.
Keywords/Search Tags:county grid, Backup distributed, post evaluation
PDF Full Text Request
Related items