Font Size: a A A

SLP And 5S Management At The Constructionsite Management Application

Posted on:2016-12-15Degree:MasterType:Thesis
Country:ChinaCandidate:P P DingFull Text:PDF
GTID:2272330482459341Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
In recent years, the development of China’s construction industry gradually into the stable period, maturing on construction techniques, methods used. Under market economic system, coupled with "adequate" situation, competition among construction companies increasingly fierce, fierce competition has also led to a tightening of corporate profit margins. In recent years, improving the profit margins is the problem that the sconstruction enterprises need to solve. As a result, more and more companies set his sights on the construction management, how to improve the existing level of construction management by optimizing the construction, so as to improve work efficiency, to increase profits.A hundred years of development, industrial engineering(Industrial Engineering, Acronym IE) theory has been developed quite mature, and has been widely used in information, finance, logistics, medical services, defense and other fields have made more significant results. the application of theory and ideological and industrial engineering construction management in the construction process, many problems will be solved. In this paper, starting from this idea, introduces the SLP(System Layout Planning Systematic layout design) layout application, and 5S management methods in improving the construction site management application in the construction site, and in Beijing L Sewage Treatment Plant construction project example case study to achieve optimization of the construction management.This paper analyzes the research background, the significance and the status of research related to home and abroad, industrial engineering and then a brief overview of the highlights of SLP industrial engineering methods, 5S management, PDCA cycle method, followed by Beijing L Sewage treatment plant construction project as an example, analyzes the profile of the project and construction management problems existing in the process, and finally said industrial engineering theory to practical work in construction management, one with SLP method of construction site layout, the second 5S is applied at the construction site management, and assess the situation after application, in order to achieve optimization of construction site management.
Keywords/Search Tags:Construction management, Industrial engineering, 5S, PDCA, SLP
PDF Full Text Request
Related items