Font Size: a A A

The Implementation Of Safety Management In The "Twenty-four Solar Term Table" Project Management

Posted on:2016-10-29Degree:MasterType:Thesis
Country:ChinaCandidate:J SongFull Text:PDF
GTID:2272330482963771Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
In the human production, security is the state that keeps the possible damage to the human life, property and environment below the accepted level. Safety management is an important branch of management science; it is a serials of activities that include decision-making, planning, organization and controlling in order to achieve security objectives; modern safety management principles, methods and means are used to analysis and study various unsafe factors, some effective measures are taken to eliminate all kinds of unsafe factors to prevent the accident. The safety management is related to both national and social development and the interests of all of the people. The electric power industry is the base of the national economy and other kinds of industry, it directly determines economic development level and people’s living standards in a country; Electrical safety is the foundation and prerequisite for the electric power industry’development. In the engineering project management, there are many problems should be solved, such as, how to improve the safety management level in power grid construction to avoid safety accidents effectively; how to improve the safety management’standardization, informationization and lean level."The twenty-four solar term table" management concept is adopted into the safety management in project construction, with the information technology; uniform standards can be achieved in the different electric power project management plan and assessment work. According to the "twenty-four solar term" management concept, software is developed to realize the project management work planning and assessment automatically.In the power grid construction, "twenty-four solar term table’ safety management is proposed to arrange the project started time, the production time node and phase time node, to ensure the reasonable construction, and effectively improve the level of safety management in project construction.
Keywords/Search Tags:Power grid construction projects, Safety management, Twenty-four solar terms, Standardized management data model and associated databases, Supporting software
PDF Full Text Request
Related items