Font Size: a A A

Research On The Cost Control Of Yantai Consulting Building Construction Project

Posted on:2016-01-15Degree:MasterType:Thesis
Country:ChinaCandidate:Y H LinFull Text:PDF
GTID:2272330482966204Subject:Project management
Abstract/Summary:PDF Full Text Request
Construction project cost control, is the investment subject of project cost control and manage the system specification, use cost control methods and practical management methods, in the process of the whole project construction planning, organization, coordination, control, to ensure the project quality, progress of the time limit for a project, construction safety, to achieve the goal of investment. Cost control is an important part in project management to obtain economic benefit, control the costs can be enterprise market competitiveness.In this paper, according to the working process of construction projects, and from the project decision-making stage, design stage, construction stage and marketing stage for cost control, each have emphasize particularly on, at various stages of project cost control methods and measures are put forward, focusing on the whole process cost control project. Through the dynamic control of project cost at various stages, reduce the project cost, to enhance the core competitiveness of the project.Based on Yantai consulting building construction project as the research object, the existing various research results on real estate development project cost control, combined with the actual situation of the project, put forward in different stages of the project cost control key points and countermeasures. First introduced the project overview, analyzed the research background and the cost of the project control present situation; Second, in Yantai consulting building construction project decision-making stage, design stage, construction stage and completion settlement stage and marketing stage of cost control are analyzed. Decision-making stage mainly analysis the project feasibility, investment estimation and economic profitability analysis, provide the data for later project cost control; Design phase by using value engineering principle, analyses the project construction scheme selection, choose the optimal design scheme is not only effective control of the project construction cost; For project construction stage, proposed the key is for bidding, material and construction change factors such as the control, so as to control the phase cost; Offered to strict cost accounting project completion settlement stage, under the condition of guarantee the project quality and cost to complete settlement; Marketing stage mainly put forward the project product promotion costs and the cost of sales cost control, to achieve the overall cost control of project marketing stage. Finally, in view of the characteristics in different stages of the project construction, and puts forward the corresponding cost control measures.
Keywords/Search Tags:Construction projects, Cost control, Control measures
PDF Full Text Request
Related items