Font Size: a A A

The Research On Risk Management Of JS Hotel Construction Project

Posted on:2015-10-01Degree:MasterType:Thesis
Country:ChinaCandidate:M J XuFull Text:PDF
GTID:2272330488461297Subject:Project management
Abstract/Summary:PDF Full Text Request
The risk management of commercial real estate projects which has extremely complex features in personnel arrangement, material allocation and capital allocation, is a really challenging task. At present, China’s commercial real estate projects are in the early stages of development; Poor project plan and the lack of awareness of project risk management still largely hindered the improvement of project management.This paper focuses on the current commercial real estate market, the macro environment and the status of the risk management of commercial real estate projects, based on a high-rise Hotel construction projects in Nantong, make a study on the risk management of the commercial real estate development projects. Firstly, the development of commercial real estate project risk management of the overall summary, briefly discussed the background, purpose and the significance of the paper research. The study of domestic and foreign commercial real estate project risk management are summarized. And then put forward the risk management should be analyzed from two aspects of organization of risk management and risk management process. The project risk management risk identification, and then into the project management of commercial real estate risk assessment and risk response. On the basis of various theories of construction project risk management, the background and characteristic of the hotel project, screening of various risk factors may produce in the process of its construction, a clear risk factors focused on risk management, in accordance with the relevant risk management theories were analyzed qualitatively and quantitatively, and the risk prevention and corresponding control measures according to the different levels of risk factors, with the minimum cost of the project to reduce the risk loss to the lowest limit.
Keywords/Search Tags:Hotel construction projects, Commercial real estate, Risk management, Risk control
PDF Full Text Request
Related items