Research On Construction Schedule Control Of A Residential Project

Posted on:2016-02-02Degree:MasterType:Thesis
Country:ChinaCandidate:S H LvFull Text:PDF
GTID:2272330503452961Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Nowadays,in the current highly competitive construction market,the key for an enterprise to survive and develop in the market competition is how to provide the construction products with short duration, high quality and low cost.Because of construction schedule management is the core content of project management, construction companies should explore a scientific method easy in this regard.This paper first analyzes the domestic and international research situation of the project progress control, and the theory of the existing schedule management, including the principle, process and method, points out the importance of progress control, and then to the construction of A large residential project as the research background, field sampling, data and data sources, according to the project and the contract requirements of the project, and the project construction schedule control plan. The progress control, through the use of Gantt chart and network plan clearly and directly show the progress of the project plan, and project schedule control process must constitute the effective implementation of measures to ensure the system, will continue to collect data of actual progress, the collection and comparative analysis, grasp the key and difficult after all the data with the original construction schedule, and set the corresponding optimization scheme the construction schedule to meet design requirements.Through A large residential project progress control process, master the implementation of progress control must have effective safeguards, in progress control key to seize the key and difficult, especially in employment, wages higher problem, understanding and mastering the first-hand information, and put forward some practical improvement measures according to the learned knowledge, including the duration of the assurance measures, such as organizational measures and contract measures, economic measures, logistics safeguard measures, training and promotion mechanism. To ensure that the progress of the project is scheduled to be completed as scheduled. In this paper, the progress control methods and measures for similar projects have a certain reference value.
Keywords/Search Tags:Schedule planning, Construction management, Dynamic control
PDF Full Text Request
Related items