Font Size: a A A

Study On The Feasibility Of United Workshop Construction Project

Posted on:2014-06-14Degree:MasterType:Thesis
Country:ChinaCandidate:X ChenFull Text:PDF
GTID:2309330452963590Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The metal structure workshop of Shanghai Boiler Works Co., Ltd.(Referred to asSBWL) was established in1958and completed in1962. Due to the long constructionhistory of the workshop, the safety can not meet the requirement of the currentspecification.At the same time, the metal structure workshop can not adapt to the needs ofthe product structure adjustment with the development of SBWL. So SBWL is planning todismantle metal structure workshop and build a new united workshop,in order to meet theneeds of the enterprise product structure adjustment and to ensure safety in production.This article carried out with very intensive and detailed explanation anddemonstration in all aspects. It gave a construction completion plan and a very detailedimplementation plan based on the demenstration of the significance and necessity of theproject construction, market and financial analysis, planned construction scale and projecttarget study, as well as the description of economics and social effect that the project maybring out. On the basis of a detailed investigation and research of the market andcustomers,this article made an analysis of the completing feasibility of the project. At thesame time, it gave practical countermeasures, which would minimize the operationalrisk,fully guarantee the successful implementation of the project by taking into account thevarious risks faced by the project.This paper demonstrates that the construction of united workshop is feasible and hasobvious economic benefits and social benefits through technical and financial feasibilityreserarch, by using analytic hierarchy process (ahp) compares the key equipmentselection.
Keywords/Search Tags:united workshop, construction, feasibility study
PDF Full Text Request
Related items