| In the last few decades,with rapid development of national economy, pace ofurbanization gradually becomes fast, urban population continually expands too, toperfect city functions and improve city grade already become the important task ofcity development. To lighten the pressure of city environment, and meet the industrialheating need and civil heating demand resulted from the improvement of people’sliving level, Ya Keshi City actively promotes the development of city centralizedheating system.With the constructing advancement of city centralized heating project, how toplan, organize and control the energy conservation of city centralized heating projectby means of the basic method of current project management already become theurgent matter to be solved during the construction of city centralized heating project.This thesis analyzes the physical truth of the Ya Keshi City centralized heating projectand summarized the energy using, energy saving technology, and energy savingmethod of the project, we get the result that the project has a reasonable division ofthe energy consumption unit, and the energy consumption calculation is accurate.There is enough variety to ensure energy supply, the main energy consumptionindicators basically reached the advanced level in Hulun Buir region. Theimplementation of the project not only to provide some employment opportunities tomeet the needs of the development of the tertiary industry in the region, to support theconstruction of Ya Keshi city, but also has a positive role in promoting the regionalenergy consumption, has a certain theoretical and practical reference value. |