| In recent years, the application of more extensive construction mode-BT model new financing is mainly applied to the field of infrastructure to meet the field of construction investment diversification requirements, but also to ease the financial pressure on our government to effectively address the construction of infrastructure projects funding needs, enhance the efficiency of its construction. However, BT mode there are still many problems in our application, the relationship between the risk factors associated with lack of clarity and control more difficult. Our continuously improve the market competitiveness of the building, but the competition is increasingly tough environment, risk management has become one of the main criteria to measure the level of construction management, and therefore improve our BT Mode in risk management is the most important current problems must be solved.This article briefly describes the current situation and the development of domestic and international background of BT financing construction mode, the main goal is to build and explore the BT model supporting risk management models, the main contents can be summarized as the following aspects: One is the concept of BT mode and mode of operation for a brief introduction, study its risk management issues, and the need to analyze their research; the second is related to the discussion of risk management theory model, to explore issues and risk factors faced by the various stages of the BT model, factors to prioritize relations and wind assessment methods, and discusses in detail the AHP, expert investigation method and fuzzy comprehensive evaluation method and Monte Carlo simulation, and expounded their respective advantages and disadvantages, and pointed out that the corresponding solutions; the third is by means of fuzzy risk comprehensive evaluation Method and BT overall project risk assessment model, expert determine its weight, relying on project risk management theory and the actual status quo AUST project risk assessment, plan and details are described as risk identification project analysis and evaluation and control and other content; the fourth is the result analysis, the results show worth the investment. Finally, project-related data indicate that the risk control and prevention measures and methods, so this study has some practical value and theoretical reference. |