Font Size: a A A

Research Of Process Management In Shougang Claim Investigation Reconstruction Project

Posted on:2012-10-09Degree:MasterType:Thesis
Country:ChinaCandidate:Y WuFull Text:PDF
GTID:2309330467978235Subject:Project management
Abstract/Summary:PDF Full Text Request
Whether a project can be completed in the scheduled time is one of the goal of the Project Management. Time Management is the scientific method to confirm schedule goal, compile schedule and resource supply plan, on the basis of coordination with quality goal and cost goal, make the goal of project to complete. Time、cost and quality is the three goals of project, all of these goals can be controlled by schedule management.This article is based on the knowledge system of project management, linking theory with practice, combined with Shougang claim investigation reconstruction project, to study the characteristic of plate products, present the resolution of Shougang claim investigation reconstruction project. The WBS chart, Gantt chart and other project management methods were used to study in detail. Draw up the schedule plan, implement the schedule control in the whole process, this article expound the whole process of time management in detail. The schedule management of project theory have been used in the practical and have achieved good effect.
Keywords/Search Tags:claim investigation, reconstruction, project schedule management, scheduleplan, schedule control
PDF Full Text Request
Related items