Font Size: a A A

Schedule Management Of Research And Development Project Of ATM Terminal Security Management System Of ICBC

Posted on:2021-12-03Degree:MasterType:Thesis
Country:ChinaCandidate:J O ZhangFull Text:PDF
GTID:2569306923450684Subject:(professional degree in business administration)
Abstract/Summary:PDF Full Text Request
Schedule management has become one of the important research topics in the field of project management.Generally speaking,the control of the project is mainly reflected in cost,quality and schedule,and the three elements of project management reflect the essence of project management.As one of the three elements,project schedule has a dialectical organic relationship with cost and quality,which together determine the success or failure of the project.The essence of project schedule management is to manage the schedule of project activities and schedule,and schedule management includes two parts:the preparation of project schedule and the control of project schedule.At present,project schedule management has been widely used in all kinds of project management implementation in China,especially in large-scale software system R&D projects,schedule management is the most important.This paper focuses on the research and development project of ATM terminal security management system of ICBC,which is jointly developed by industrial and Commercial Bank of China and Shenyang general software company.It has the comprehensive characteristics of large research and development workload,complex system architecture,many terminal points,tight research and development cycle,high system quality requirements,and belongs to the classic large software system research and development project For example,in the actual implementation of the project,it is also urgent to use the theory of project schedule management to guide.Based on the theory and method of project schedule management,this paper takes the schedule management of the ATM terminal security management system R&D project of ICBC as the research object,and studies from two dimensions of project schedule and schedule control.On the basis of academic theory,combined with the actual situation of project management,the significance and value of large software project schedule management are explored.
Keywords/Search Tags:Industrial and Commercial Bank of China, ATM, software system R&D project, Schedule management, schedule plan, schedule control
PDF Full Text Request
Related items