Font Size: a A A

Pull System Management Improvement Base On Faurecia Plant

Posted on:2016-01-15Degree:MasterType:Thesis
Country:ChinaCandidate:L QiFull Text:PDF
GTID:2309330467979581Subject:Business administration
Abstract/Summary:PDF Full Text Request
China is the biggest automobile production country, and the mainstay industry is the trigger of our economic increasing, employment enlarging, domestic demand simulating. Auto parts industry is the most important element of automobile industry, they are developing corporately. The auto parts industry is getting more and more important along with the economy globalization and industrial division elaborating.At present,one the most important demands for automotive suppliers from OEM companies is that delivery on time,in order to realize the maximize profits,minimum wastes and the minimum inventory level.The requirement makes automible parts enterprises also need to achieve the target which is delivery the righ quantity and quality parts in need time.Therefore,automotive parts enterprises should change the traditional mode of production management, guarantee the stability and flexibility, establish a good production management system, and meet the requirements of automobile enterprise on time delivery has very important practical significance.Pull system production concept of lean production can provide the methods for enterprises to achieve such a high quality, low cost, the purpose of timely delivery requirements. Firstly,ase on Faurecia ANTING company, from the analysis of the pull production implementing status, using the combination of theory and practice, shopfloor observing, We found some improvement points in pull system production in Faurecia ANTING plant, such as the variability of the material handling operatio, flexibility production mode in different abnormal status,the method of the WIP number of the production line,shopstock of the frame welding and assembly line are not reasoneable. Secondly, refer the knowledge of the pull system concept,little law,SMED,cycle time and etc to provide the realted proposal for weak points and trail run at the scene of the new POLO production line to validate. Finally,summary the learns learned from the trial run on new POLO production line,looking for other production line pull production process optimization and future actions.This research conclusion is aim at the optimization of pull system in Faurecia Anting Frame Plant. It can reduce the production cost, improve the products quality and increase the competitiveness of the company, which could be the guidance of similar production system enterprises.
Keywords/Search Tags:pull system, takt time, cycle time, inventory, standardize work
PDF Full Text Request
Related items